home
PRICING 2010 -
Pricing is a combination of an hourly trucking rate and the cost of the materials

TRUCKING RATES
Tandem Stone Slinger

• $125/hr + taxes ** See conditions below for billing policy
• 16 yard capacity box for lighter materials (bark mulch, loam soils)
• 12 yard weight capacity for heavy materials (stone / sand / gravel)
• 70 foot maximum throw distance (from back bumper of truck)

Tri-drive Stone Slinger
• $140/hr + taxes ** See conditions below for billing policy
• 20 yard capacity box for lighter materials (bark mulch, loam soils)
• 16 yard weight capacity for heavy materials (stone / sand / gravel)
• 100 foot maximum throw distance (from back bumper of truck)

MATERIALS AND PRICING
• Pricing is variable and is dictated by our suppliers.
• Please call and we'll get you the best price on what you need.
• If you have an account at a supplier of your choice, we are happy to be a contract hauler of your materials.
• We can haul and place sand, gravel, stone, soil, bark mulch, various landscape materials. Maximum diameter of material is 3 inches

MATERIALS SUPPLIERS
• Salmon Arm and Shuswap

Baird Ready Mix, Gem Gravel Products, Laverne Turner Contracting, Pedro's Garden Supply, Quinn Gravel, Salmon Arm Ready Mix, Zappone Aggregate Processors, and Zappone Bros. Contracting.
• Vernon and the North Okanagan
Just Rocks, Meggaits Sand and Gravel, Okanagan Aggregates, Otter Lake Gravel, Postill & Sons, Pryce Landscape Products and Western Rock Products.
• Sicamous and Revelstoke
H & J Ready Mix, Mara Sand and Gravel, and Salmon Arm Ready Mix

BILLING POLICY
Salmon Arm and Shuswap Job Sites
• Billing starts when we depart from our yard in Salmon Arm, and ends when we depart from your work site after our final load.
• In Salmon Arm and the Shuswap we have a 1 hour minimum billing policy.
Vernon, Revelstoke, and other locations
• Billing starts when we depart from our yard in Salmon Arm, and ends when we depart from your work site after our final load.
• If you require our services for a complete 8 hour day, we will charge the one way commute from Salmon Arm at 50% of the hourly charge.
• For Vernon, Revelstoke, and other locations we have a 2 hour minimum billing policy.
• If it is more cost effective for our drivers and equipment to overnight near the job site, the customer will be responsible for a per diem of $50/night and the cost of the hotel room.

CONDITIONS

• We are not responsible for loading time at the source of the materials.
• We do allow loading of customer supplied materials at the job site but only by qualified equipment operators.
• We require clean, consistent aggregate and materials. Maximum material diameter is 3 inches.
• Customer supplied materials are subject to the approval of Shuswap Materials Placement Ltd.
• We work as efficiently as possible, and while we have our customer's best interest in mind, we will not compromise safety.
• Traffic control, road closures, work permits are the responsibility of the customer.
• We require an organized and safe work site.